Memphis TN (901) 350-4014
Bathroom remodeling · Memphis

A bathroom you will actually want to use.

Tile that lays flat, a shower that does not leak into the room next door, and a vanity that fits the plumbing you already have.

Most bathroom problems in older Memphis houses are not cosmetic. Water has been getting behind the wall for years. We open it up, find out what is actually wrong, fix that first, and only then choose tile and finishes. That order is why our remodels outlast a weekend DIY.

Experience
20+ years
Area
4 states
Licensed
GC
20+ yearsRenovations across the Memphis metro
Memphis + 4 statesMemphis metro · West TN · North MS · Eastern AR
One point of contactSame team from estimate to final walkthrough
Financing availableRenovation loans from $2k to $500k
What we handle

The parts that decide whether a bathroom holds up.

  • Water first, finishes second

    We open the wall or the pan before we pick tile. Rotten subfloor, a failed wax ring or a shower without a proper pan gets replaced before anything looks finished. Otherwise you are decorating a problem.

  • Tile set by a tile setter

    Not a general carpenter with a tile saw. Floor and wall tile get set by someone who does it every day, with the correct thinset for the substrate and a real expansion gap. Lippage on a floor is a level problem, not a style choice.

  • Shower built to be tiled

    A standard 2×3 shower pan is the durable choice for a primary bathroom. Curved or custom-pan designs exist and we will build them, but we will tell you honestly what they cost in labor and how they hold up.

  • Ventilation that works

    A bathroom without a properly vented fan will destroy the ceiling above it and any wood framing nearby. We check and correct the duct run rather than installing a second fan that moves nothing.

How it runs

Four steps, no surprises in the middle.

  • Photos or a walkthrough

    Send photos on WhatsApp or let us look at it in person. For a small guest bath, photos are usually enough to scope it.

  • Scope and line items

    You get the work broken out — demo, framing, plumbing, tile, paint — so you can see where the money goes and cut anything you do not want.

  • Fixed schedule

    We give you a start date and a duration before signing. A full gut remodel is typically two to three weeks.

  • Final walkthrough

    We walk the finished bathroom with you, fix punch-list items, and hand over the warranty documents.

What moves the price

Why we cannot quote a number over the phone.

Size of the room
A 5×7 hall bath and a 9×10 primary bath with a tub do not cost the same, even finished identically. Square footage and layout are the first two numbers we need.
Shower or tub, and which one
A tiled shower pan is more labor than a standard tub surround. A curbless or curbless-access shower is more again.
What is behind the wall
Water-damaged subfloor or framing changes the scope after demolition. We show you what we find before we start the finish work.
Plumbing relocation
Moving a toilet or a sink means new drain and vent line. Staying in place is dramatically cheaper and we will say so.
Tile material and size
Ceramic 4×4 is quick and forgiving. Large-format porcelain or natural stone needs a flatter substrate, more cuts and more time.
Level of finish
Builder grade to custom. This is the single biggest lever and it is entirely your call.

We quote in writing after seeing the job. Anyone who gives you a firm bathroom price on the first phone call is guessing — and either they will not show up or the price will move once they see it.

Common questions

What homeowners ask us before starting.

Do you pull permits for bathroom work?

Yes, when the scope requires it — most full gut remodels in Shelby County do, particularly when plumbing moves or the shower area changes. We handle the permit and the inspection scheduling.

Can you work in an occupied house?

Yes. Many of our jobs are in occupied rentals and owner-occupied homes. We contain the dust, keep a path you can walk through, and give you a realistic picture of what it is like to live with during the work.

How long does a full gut remodel take?

Two to three weeks for a standard primary bathroom. A guest bath that keeps its layout is shorter. Weather and inspection scheduling can move that by a few days.

Do you fix mold or water damage found during demolition?

We stop, show you what we found and what it costs to fix properly, and we do not proceed into the finish work until it is resolved. That is non-negotiable.

Can I reuse the existing tub or vanity?

Usually. If it is in good condition we will price the work around keeping it. Sometimes reusing the layout is the cheapest path and sometimes replacing it is cheaper than working around it.

Our work

What this actually looks like finished.

Staged living room in a fully renovated Memphis home — finished walls, trim, recessed lighting and finished flooring
Finished interior after a full renovation
Completed interior with painted brick accent wall, fireplace surround and finished ceiling in a rebuilt home
Interior finish after reconstruction

Want a real number instead of a range?

Send a few photos and we will tell you what your bathroom actually costs to remodel — not a range, an estimate you can plan around.

Call now (901) 350-4014